Ankhu Khola Jalvidhyut Company Ltd

Energy & Infrastructure

Nepal’s growing energy needs call for reliable infrastructure and sustainable generation. Hydropower remains a key part of creating a stronger and more resilient energy future

Project at a Glance

Akhu Khola Hydro was incorporated in 1995 with an objective of hydroelectricity generation through optimal utilization of resources within the country. Nepal Electricity Akhu Khola Hydro was incorporated in 1995 with an objective of hydroelectricity generation through optimal utilization of resources within the country.

Objectives & Scope

  • Installed capacity: 6.2 MW
  • Project Location: Maijogmai Rural Municipality
  • Type of Scheme: Run of River (RoR)
  • Gross Head: 133.1 m
  • Net Rated Head: 123.49 m
  • Design Discharge: 5.78 m3/s
  • Net Annual Energy: 35.92 GWh
  • Headrace pipe: 3006.7 m
  • Power Evacuation to: Godak Substation (4 km from Powerhouse)

Nepal’s growing energy needs call for reliable infrastructure and sustainable generation. Hydropower remains a key part of creating a stronger and more resilient energy future